Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
m
m
Line 43: Line 43:
 
##* Talk 4 1:30 pm David [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1000 Simulation/Reconstruction]  F326/327
 
##* Talk 4 1:30 pm David [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1000 Simulation/Reconstruction]  F326/327
 
## Thursday F326/327 Mar 20
 
## Thursday F326/327 Mar 20
##* [http://www-meg.phys.cmu.edu/~yvhaarle/cdctalk_nopause.pdf Talk 2]  9:00 am Yves
+
##* [http://www-meg.phys.cmu.edu/~yvhaarle/cdctalk.pdf Talk 2]  9:00 am Yves
 
##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1001 Talk 6]  4:30 pm Elton
 
##* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1001 Talk 6]  4:30 pm Elton
 
## Friday F326/327 Mar 14
 
## Friday F326/327 Mar 14

Revision as of 23:42, 21 March 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
  4. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  5. Second round of dry runs (week of Mar 17)
    1. Monday F326/327 Mar 17
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  6. Final talks to Elke:Tue Mar 25
  7. Review: Mar 27 and 28
  8. issues that need special attention