Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
(add Yves 3rd dry run)
m
Line 49: Line 49:
 
## Monday F326/327 Mar 24
 
## Monday F326/327 Mar 24
 
##*  [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1003 Talk 1] 9:00 am Curtis
 
##*  [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1003 Talk 1] 9:00 am Curtis
##* [http://www-meg.phys.cmu.edu/~yvhaarle/cdctalk.pdf Talk 2 (is this link correct?)] 4:00 pm Yves
+
##* [http://www-meg.phys.cmu.edu/~yvhaarle/cdctalk.pdf Talk 2 (is this link correct? Yes)] 4:00 pm Yves
 
# Final talks to Elke:Tue Mar 25
 
# Final talks to Elke:Tue Mar 25
 
# Review: Mar 27 and 28
 
# Review: Mar 27 and 28
 
# issues that need special attention
 
# issues that need special attention

Revision as of 14:57, 24 March 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
  4. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  5. Second round of dry runs (weeks of Mar 17 and 24)
    1. Monday F326/327 Mar 17
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
    6. Monday F326/327 Mar 24
  6. Final talks to Elke:Tue Mar 25
  7. Review: Mar 27 and 28
  8. issues that need special attention