Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
#* Charge, [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/Agenda.doc Agenda], Reviewers
 
#* Charge, [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/Agenda.doc Agenda], Reviewers
 
#* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)
 
#* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)
 +
 
# '''Pre-brief Material for the reviewers.'''
 
# '''Pre-brief Material for the reviewers.'''
 +
 
#* GlueX-doc-999 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=999 GlueX Physics and Detecor Performance Metrics]
 
#* GlueX-doc-999 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=999 GlueX Physics and Detecor Performance Metrics]
 
#* GlueX-doc-990 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=990 The GlueX Central Drift Chamber]
 
#* GlueX-doc-990 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=990 The GlueX Central Drift Chamber]
Line 16: Line 18:
 
#* GlueX-doc-866 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=866 Design goals for the Hall D detector and subsystems]
 
#* GlueX-doc-866 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=866 Design goals for the Hall D detector and subsystems]
 
#* GlueX-doc-992 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=992 Start Counter Update]
 
#* GlueX-doc-992 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=992 Start Counter Update]
#* Impact of PID on Physics ([http://www.jlab.org/~gen/gluex web page]) (Eugene)
 
  
 +
# Relevant Wiki Pages
  
 +
#* Description [[CDC]]
 +
#* Description [[FDC]]
 +
#* Description [[Forward Time-of-Flight]]
 +
#* Description [[Start Counter]] (Werner)
 +
#* Description [[Electronics]]
 +
#* Safety/QA documentation [[ESH&Q]] ?
 +
#* Drawings (Tim)
  
  
#** Introduction Physics Motivation (Curtis)
+
== Dry Run Schedule for the Review ==
  
#** [http://clasweb.jlab.org/websvn/prod/listing.php?repname=GlueX&path=%2Ftrunk%2Fhome%2Fdavidl%2FNotes%2FTracking4%2F#_trunk_home_davidl_Notes_Tracking4_ Simulation and Reconstruction] (David)
 
#** Description [[CDC]] (Curtis)
 
#** Description [[FDC]] (Simon and Dan)
 
#** Description [[Forward Time-of-Flight]] (Beni/Matt) and the  [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=994  document for CDR]
 
#** Description [[Start Counter]] (Werner)
 
#** Electronics (F1TDC, ASIC, 100 MHz Flash) (Fernando)
 
#* Safety/QA documentation [[ESH&Q]] ?
 
#* Drawings (Tim)
 
#* Other?
 
 
# First round of dry runs (week of March 10)  
 
# First round of dry runs (week of March 10)  
 
## Monday L102/104 Mar 10
 
## Monday L102/104 Mar 10

Revision as of 11:36, 13 May 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  1. Pre-brief Material for the reviewers.
  1. Relevant Wiki Pages


Dry Run Schedule for the Review

  1. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  2. Second round of dry runs (weeks of Mar 17 and 24)
    1. Monday F326/327 Mar 17
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
    6. Monday F326/327 Mar 24
  3. Final talks to Elke:Tue Mar 25
  4. Review: Mar 27 and 28
  5. issues that need special attention