Line 27: Line 27:
 
** Drawings (Tim)
 
** Drawings (Tim)
  
 +
* <b>Final Talks</b>
 +
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1003 GlueX Physics and Detector Performance]
 +
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1010 CDC Design and Construction]
 +
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=997 FDC Design]
 +
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1000 Drift Chamber Reconstruction Software]
 +
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1001 Time-of-flight measurements with the barrel calorimeter and the forward scintillators]
 +
** [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1011 Charged Particle Identification in GLUEX]
  
 
== Dry Run Schedule for the Review ==
 
== Dry Run Schedule for the Review ==

Revision as of 11:44, 13 May 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

Dry Run Schedule for the Review

  1. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  2. Second round of dry runs (weeks of Mar 17 and 24)
    1. Monday F326/327 Mar 17
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
    6. Monday F326/327 Mar 24
  3. Final talks to Elke:Tue Mar 25
  4. Review: Mar 27 and 28
  5. issues that need special attention