Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
(The Hall D DC and PID Final Design and Safety Review)
(The Hall D DC and PID Final Design and Safety Review)
Line 1: Line 1:
 
== The Hall D DC and PID Final Design and Safety Review ==
 
== The Hall D DC and PID Final Design and Safety Review ==
  
* Charge, [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/Agenda.doc Agenda], Reviewers
+
* [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/Agenda.doc Agenda]
 
* [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Mar 27-28 Review Website] (halld guest)
 
* [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Mar 27-28 Review Website] (halld guest)
 
* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)
 
* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)

Revision as of 09:56, 14 May 2008

The Hall D DC and PID Final Design and Safety Review

Material Prepared for the Review


Relevant Wiki Pages

Dry Run Schedule for the Review

  1. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  2. Second round of dry runs (weeks of Mar 17 and 24)
    1. Monday F326/327 Mar 17
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
    6. Monday F326/327 Mar 24
  3. Final talks to Elke:Tue Mar 25
  4. Review: Mar 27 and 28
  5. issues that need special attention