Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
Line 4: Line 4:
 
# [http://www.jlab.org/Hall-D/reviews Previous Reviews]
 
# [http://www.jlab.org/Hall-D/reviews Previous Reviews]
 
# [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Mar 27-28 Review Documents] (halld guest)
 
# [http://www.jlab.org/Hall-D/guest_secure/Tracking_PID_REVIEW_Mar08/ Mar 27-28 Review Documents] (halld guest)
#* Charge, Agenda, Reviewers,
+
#* Charge, Agenda, Reviewers
 
#* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)
 
#* [http://www.jlab.org/Hall-D/gluex_secure/schedule_final_eir-review.pdf P3e Schedule] (gluex)
 
# Pre-brief Material. Due Mar 19 to reviewers.
 
# Pre-brief Material. Due Mar 19 to reviewers.

Revision as of 13:52, 22 February 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
    • Documents
      • Introduction Physics Motivation (Curtis)
      • Impact of PID on Physics (web page) (Eugene)
      • Description CDC (Curtis)
      • Description FDC (Simon and Dan)
      • Description Forward Time-of-Flight (Alex/Beni?)
      • Electronics (F1TDC, ASIC, 100 MHz Flash) (Fernando)
    • Safety/QA documentation?
    • Drawings (Tim)
    • Other?
  4. First round of dry runs (week of March 10) TENTATIVE
    1. Monday F326/327 Mar 10
      • Talk 1 2:30pm Curtis
    2. Tuesday F326/327 Mar 11
      • Talk 2 4:00 pm Yves
    3. Wednesday F326/327 Mar 12
      • Talk 3 8:00 am Dan
      • Talk 4 4:00 pm David
    4. Thursday F326/327 Mar 13
      • Talk 5 4:30 pm Fernando
      • Talk 6 4:30 pm Elton
    5. Friday L207 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 8 10:00 am Tim
  5. Second round of dry runs (week of Mar 17) TENTATIVE
  6. Final talks to Elke:Tue Mar 25
  7. Review: Mar 27 and 28
  8. issues that need special attention