DC and PID Review

From GlueXWiki
Revision as of 16:23, 7 March 2008 by Whitey (Talk | contribs)

Jump to: navigation, search

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
  4. First round of dry runs (week of March 10) TENTATIVE
    1. Monday F326/327 Mar 10
      • Talk 15 2:30pm Fernando
    2. Tuesday F326/327 Mar 11
      • Talk 8 4:00 pm Tim

DC mechanical design

    1. Wednesday F326/327 Mar 12
      • Talk 3 8:00 am Dan
      • Talk 4 4:00 pm David
    2. Thursday F326/327 Mar 13
      • Talk 2 4:30 pm Yves
      • Talk 6 4:30 pm Elton
    3. Friday L207 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  1. Second round of dry runs (week of Mar 17) TENTATIVE
  2. Final talks to Elke:Tue Mar 25
  3. Review: Mar 27 and 28
  4. issues that need special attention