DC and PID Review
From GlueXWiki
Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28
- Previous Reviews
- Mar 27-28 Review Documents (halld guest)
- Charge, Agenda, Reviewers
- P3e Schedule (gluex)
- Pre-brief Material. Due Mar 19 to reviewers.
- Documents
- Introduction Physics Motivation (Curtis)
- Impact of PID on Physics (web page) (Eugene)
- Simulation and Reconstruction (David)
- Description CDC (Curtis)
- Description FDC (Simon and Dan)
- Description Forward Time-of-Flight (Beni/Matt) and the document for CDR
- Description Start Counter (Werner)
- Electronics (F1TDC, ASIC, 100 MHz Flash) (Fernando)
- Safety/QA documentation ESH&Q ?
- Drawings (Tim)
- Other?
- Documents
- First round of dry runs (week of March 10)
- Monday L102/104 Mar 10
- Talk 15 2:30pm Fernando Tracking & PID Electronics
- Tuesday F326/327 Mar 11
- Talk 8 4:00 pm Tim DC mechanical design
- Wednesday Mar 12
- Talk 3 8:00 am Dan FDC Design F326/327
- Talk 4 4:00 pm David Simulation/Reconstruction L207
- Thursday F326/327 Mar 13
- Talk 2 9:00 am Yves
- Talk 6 4:30 pm Elton
- Friday F326/327 Mar 14
- Talk 7 8:00 am Eugene
- Talk 1 10:00 am Curtis
- Monday L102/104 Mar 10
- Second round of dry runs (week of Mar 17)
- Monday F326/327 Mar 17
- Talk 15 3:30pm Fernando
- Tuesday F326/327 Mar 18
- Talk 8 4:00 pm Tim DC mechanical design
- Wednesday Mar 19
- Talk 3 8:00 am Dan FDC Design F326/327
- Talk 4 1:30 pm David Simulation/Reconstruction F326/327
- Thursday F326/327 Mar 20
- Talk 2 9:00 am Yves
- Talk 6 4:30 pm Elton
- Friday F326/327 Mar 14
- Talk 7 8:00 am Eugene
- Talk 1 10:00 am Curtis
- Monday F326/327 Mar 17
- Final talks to Elke:Tue Mar 25
- Review: Mar 27 and 28
- issues that need special attention