DC and PID Review

From GlueXWiki
Revision as of 11:37, 13 May 2008 by Cmeyer (Talk | contribs)

Jump to: navigation, search

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  • Pre-brief Material for the reviewers.
  • Relevant Wiki Pages


Dry Run Schedule for the Review

  1. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  2. Second round of dry runs (weeks of Mar 17 and 24)
    1. Monday F326/327 Mar 17
    2. Tuesday F326/327 Mar 18
    3. Wednesday Mar 19
    4. Thursday F326/327 Mar 20
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
    6. Monday F326/327 Mar 24
  3. Final talks to Elke:Tue Mar 25
  4. Review: Mar 27 and 28
  5. issues that need special attention