Difference between revisions of "DIRC"

From GlueXWiki
Jump to: navigation, search
(Ongoing Tests)
(26 intermediate revisions by 2 users not shown)
Line 32: Line 32:
 
* [[DIRC Software Tasks]]
 
* [[DIRC Software Tasks]]
 
* [[DIRC CCDB Tables]]
 
* [[DIRC CCDB Tables]]
 +
* [[Monitoring Tools]]
  
 
=== Slow Controls ===
 
=== Slow Controls ===
Line 37: Line 38:
 
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Shift worker instructions] (in progress)
 
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Shift worker instructions] (in progress)
  
=== Water Test ===
+
=== Ongoing Tests ===
 +
* [[Water test]]
 +
* [[Mirror prototype test plan]]
 +
 
 +
== Water Quality Test and Control ==
 +
* [[Water Sample Test Tracking]]
 +
 
 +
== To-do List For Next Major Maintenance ==
 +
* [[2020 Winter - 2021 Spring]]
  
 
== Commissioning ==
 
== Commissioning ==
 
* [[Spring 2019 DIRC Commissioning]]
 
* [[Spring 2019 DIRC Commissioning]]
 +
* [[Fall 2019 DIRC Commissioning]]
 +
* [[Summer 2020 DIRC Commissioning]]
  
 
== Reviews ==
 
== Reviews ==
Line 48: Line 59:
  
 
== Instructions for Experts ==
 
== Instructions for Experts ==
* [https://halldweb.jlab.org/hdops/wiki/index.php/Threshold_Scan_Procedure Threshold Scan]
+
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Expert_Instructions Expert Instruction Page]
* LED Run Procedure
+
 
 +
== Shifter Operation Manual ==
 +
* [https://halldweb.jlab.org/hdops/wiki/index.php/DIRC_Shift Shifter Operation Manual]
 +
 
 +
== Spare Equipment ==
 +
* [[DIRC Spare Parts and Storage location]]
 +
* [[Sequence to Recover Non-responding DIRC PMT Modules]]
 +
 
 +
= Documentation =
 +
* [https://dspace.mit.edu/handle/1721.1/119104 Fast DIRC Thesis] (John Hardin)
 +
 
 +
= DIRC Operation Issues Tracking =
 +
* [[PMT tiles missing after restarting data taking]]
 +
* [[DIRC LV Power Cycling Schedule]]
 +
 
 +
= Relevant data validation page =
 +
* [[RunPeriod-2019-11 Validation]]

Revision as of 08:33, 18 November 2020

GlueX Upgrade PID Meetings

DIRC Detector

Summary

DIRC Movie: Bar 7, x=(0,5) cm

Fused silica bar boxes

  • Documents from BaBar and transportation (on DocDB)

Optical and bar box

Multianode PMTs

Electronics

Software

Slow Controls

Ongoing Tests

Water Quality Test and Control

To-do List For Next Major Maintenance

Commissioning

Reviews

Instructions for Experts

Shifter Operation Manual

Spare Equipment

Documentation

DIRC Operation Issues Tracking

Relevant data validation page