Difference between revisions of "Dec. 13, 2007 Tracking CDC/FDC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 25: | Line 25: | ||
* System monitoring and time histories. | * System monitoring and time histories. | ||
− | * HV and LV systems. | + | * HV and LV systems (includes definitions of ground). |
* Readout, HV, and LV cabling issues. | * Readout, HV, and LV cabling issues. | ||
* Gas system design. | * Gas system design. |
Revision as of 08:48, 12 December 2007
Meeting Connections
To connect from the outside, please use ESNET at
1.) ESNET: 8242553
Agenda
- Discussion of preamp/preamp board tests for the FDC and CDC.
- configuring/powering the daughter and interposer boards
- required measurements to give feedback to Mitch, Gerard, and Fernando
- Visit to CMU
- Updated Design Report Documentation
- On the Wiki pages
- For the next version of the DR
- Cooling the preamp cards and specific requirements
- FDC
- CDC
- Chamber installation issues.
- Chamber alignment issues.
- System monitoring and time histories.
- HV and LV systems (includes definitions of ground).
- Readout, HV, and LV cabling issues.
- Gas system design.