Difference between revisions of "Dec 1, 2011 SiPM Electrical and Cooling"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Action Items from previous meetings == # Jack to update board with bias compensation circuitry (Jack) == Tentative Agenda == # Announcements # Action Items # Schedule, repo...")
 
(Tentative Agenda)
Line 9: Line 9:
 
# Schedule, reporting, and manpower (Elton)
 
# Schedule, reporting, and manpower (Elton)
 
# SiPM production testing (everyone)
 
# SiPM production testing (everyone)
## Light source / optics
 
## Electronic boards
 
## Cabling
 
## Cooling plate
 
## Programming
 
## Other?
 
 
# SiPM testing (Ivan)
 
# SiPM testing (Ivan)
 
# Mechanical assembly (Scot)
 
# Mechanical assembly (Scot)

Revision as of 18:30, 17 November 2011

Action Items from previous meetings

  1. Jack to update board with bias compensation circuitry (Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. SiPM testing (Ivan)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)

Minutes

Attending: