Difference between revisions of "Dec 1, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(Created page with "== Action Items from previous meetings == # Jack to update board with bias compensation circuitry (Jack) == Tentative Agenda == # Announcements # Action Items # Schedule, repo...") |
(→Tentative Agenda) |
||
Line 9: | Line 9: | ||
# Schedule, reporting, and manpower (Elton) | # Schedule, reporting, and manpower (Elton) | ||
# SiPM production testing (everyone) | # SiPM production testing (everyone) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
# SiPM testing (Ivan) | # SiPM testing (Ivan) | ||
# Mechanical assembly (Scot) | # Mechanical assembly (Scot) |
Revision as of 18:30, 17 November 2011
Action Items from previous meetings
- Jack to update board with bias compensation circuitry (Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPM testing (Ivan)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando)
Minutes
Attending: