Dec 1, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 18:29, 17 November 2011 by Elton (Talk | contribs) (Created page with "== Action Items from previous meetings == # Jack to update board with bias compensation circuitry (Jack) == Tentative Agenda == # Announcements # Action Items # Schedule, repo...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Action Items from previous meetings

  1. Jack to update board with bias compensation circuitry (Jack)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Programming
    6. Other?
  5. SiPM testing (Ivan)
  6. Mechanical assembly (Scot)
  7. Mechanical (Jim)
  8. Mechanical drawings (Chuck)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)

Minutes

Attending: