Difference between revisions of "Dec 18, 2012 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(7 intermediate revisions by 4 users not shown)
Line 19: Line 19:
 
# Produce plots of SiPM parameters, such as the ones already shown, for Vover=1.0, 1.1 V (Orlando)
 
# Produce plots of SiPM parameters, such as the ones already shown, for Vover=1.0, 1.1 V (Orlando)
 
# After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
 
# After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
# For the suspect SiPMs, calculate the integrated dark rate for the array to compare them (Orlando)
+
# <strike> For the suspect SiPMs, calculate the integrated dark rate for the array to compare them (Orlando) </strike> Discussed at Bcal Readout meeting.
  
 
= Tentative Agenda =
 
= Tentative Agenda =
Line 25: Line 25:
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items
# FCAL  
+
# FCAL
#* [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2118 Results on Energy and Timing Resolution of FCAL in 2011--2012 Beamtest]
+
#* [https://halldweb.jlab.org/wiki/index.php/File:FCAL_Frame.JPG Frame Installed]
 +
#* [https://halldweb.jlab.org/wiki/images/d/d5/2012-12-18FCALbeamtest_KeiMoriya.pdf Beamtest presentation]
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2118 Results on Energy and Timing Resolution of FCAL in 2011--2012 Beamtest analysis note]
 
# BCAL
 
# BCAL
 
# USM  
 
# USM  
Line 36: Line 38:
 
=Minutes=
 
=Minutes=
  
''Attendees:
+
''Attendees: Elton, David, John, Yi, Beni (JLab); Hayk, Will, Alam, Orlando (USM); Shawn, Zisis, Andrei (UofR); Matt, Kei, Dan (IU); Christina, George, Pavlos (Athens)
 +
 
 +
 
 +
# Announcements
 +
# Review of Action Items
 +
# Monitoring
 +
## Bcal boards are proceeding as scheduled. Controller boards are being stuffed.
 +
## Fcal measurements with first-article has raised two issues
 +
##* Light uniformity on edges of plexiglass is improved by polishing edges.
 +
##* The 2 red LEDs seem to output sufficient light, but the 2 green LEDs do not produce sufficient light under nominal configuration.
 +
##* Amount of light collected from green LEDs  with plexiglass is 1/2-1/3 of that with plexiglass
 +
##* Sanding the top and bottom increases collection of light by a factor of about 6. Still, Christina does not think this is sufficient.
 +
##* Elton: IU should propose the dynamic range of signals required for the LED monitoring system
 +
##* Christina: One may also try to find alternative LEDs that better match the dynamic range necessary
 +
# FCAL
 +
#* [https://halldweb.jlab.org/wiki/index.php/File:FCAL_Frame.JPG Frame Installed]
 +
#** Initialt survey and alignment of frame is ongoing now
 +
#** Techs still need to do more work to ready the frame. John Frye will come down after Jan 14 for fine alignment and help start stacking blocks.
 +
#** Stacking will start toward the end of January.
 +
#* [https://halldweb.jlab.org/wiki/images/d/d5/2012-12-18FCALbeamtest_KeiMoriya.pdf Beamtest presentation]
 +
#** DE: fit terms in quadrature in the parameterization.
 +
#** DE: consider fitting data sets with consistent HV configurations separately
 +
#** DT: evaluate Gaussian extraction of time to compare with previous studies
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2118 Results on Energy and Timing Resolution of FCAL in 2011--2012 Beamtest analysis note]
 +
# BCAL
 +
# USM
 +
#* Some discussion regarding consistent summary of data for all parameters at Vover =1.0, 1.1 V (to supplement data on 1.2V)
 +
#* Shipment of 360 sensors is still in Customs in Santiago, waiting for final disposition.
 +
# Simulations
 +
# TDR update
 +
# Calibration of Calorimeters
 +
# Any other business

Latest revision as of 17:10, 24 February 2017

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting(s)

  1. Produce plots of SiPM parameters, such as the ones already shown, for Vover=1.0, 1.1 V (Orlando)
  2. After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
  3. For the suspect SiPMs, calculate the integrated dark rate for the array to compare them (Orlando) Discussed at Bcal Readout meeting.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. FCAL
  4. BCAL
  5. USM
  6. Simulations
  7. TDR update
  8. Calibration of Calorimeters
  9. Any other business

Minutes

Attendees: Elton, David, John, Yi, Beni (JLab); Hayk, Will, Alam, Orlando (USM); Shawn, Zisis, Andrei (UofR); Matt, Kei, Dan (IU); Christina, George, Pavlos (Athens)


  1. Announcements
  2. Review of Action Items
  3. Monitoring
    1. Bcal boards are proceeding as scheduled. Controller boards are being stuffed.
    2. Fcal measurements with first-article has raised two issues
      • Light uniformity on edges of plexiglass is improved by polishing edges.
      • The 2 red LEDs seem to output sufficient light, but the 2 green LEDs do not produce sufficient light under nominal configuration.
      • Amount of light collected from green LEDs with plexiglass is 1/2-1/3 of that with plexiglass
      • Sanding the top and bottom increases collection of light by a factor of about 6. Still, Christina does not think this is sufficient.
      • Elton: IU should propose the dynamic range of signals required for the LED monitoring system
      • Christina: One may also try to find alternative LEDs that better match the dynamic range necessary
  4. FCAL
  5. BCAL
  6. USM
    • Some discussion regarding consistent summary of data for all parameters at Vover =1.0, 1.1 V (to supplement data on 1.2V)
    • Shipment of 360 sensors is still in Customs in Santiago, waiting for final disposition.
  7. Simulations
  8. TDR update
  9. Calibration of Calorimeters
  10. Any other business