Difference between revisions of "Dec 8, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Documents to Review)
(Tentative Agenda)
Line 22: Line 22:
 
# Calibration/monitoring update Athens: [[Media:APD_vs_tube_linearity.ppt]]
 
# Calibration/monitoring update Athens: [[Media:APD_vs_tube_linearity.ppt]]
  
= Tentative Agenda =
+
= Tentative Agenda (Emphasis is Calibration) =
  
 
# Announcements
 
# Announcements
 
# Calibration
 
# Calibration
 
#* Progress on filling in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]].
 
#* Progress on filling in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]].
# FCAL
+
# FCAL Update
#* Report of timing studies with pmts and time calibration (Jake Bennet) [[http://dustbunny.physics.indiana.edu/~mashephe/fcal_fadc_24Nov.pdf PDF slides]]
+
#* Approximations of the sqrt( -ln( x) ) function for the timing algorithm (Mihajlo): [[http://dustbunny.physics.indiana.edu/~mikornic/GlueX/T50expand.pdf T50 expansion]]
+
#* Discussion with C. Cuevas & Co.
+
 
# BCAL
 
# BCAL
## [[BCAL#Roadmap_toward_a_decision_for_Bcal_Readout| BCAL readout]]
+
## [[Fiber Test with SiPM | Testing of fibers with SiPM readout and Sr90 source]] (Beni)
## [[Resolution studies]]
+
## Magnetic Field Update (JLab)
## BCAL Construction MOU
+
## Other updates
##* [[Oct 15, 2008 Calorimetry | BCAL Construction Docs & Action Items]]
+
## SiPM progress
+
## Readout
+
##* Review of use of APDs for readout -- see material in 'Documents to Review' above (Serguei)
+
##* Magnetic Field Update (JLab)?
+
 
# Any other business
 
# Any other business
  
 
=Minutes=
 
=Minutes=
 
Attending:
 
Attending:

Revision as of 14:09, 1 December 2008

Time: 11:15 ET.

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Nov 24 meeting

  1. Updates on Calibration Specification Table.
  2. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of Bcal on acceptance.
  3. Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
  4. Add roadmap for Bcal Roadmap to wiki (Elton)
  5. Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  6. Updated schedule with new Fcal procurement dates. (Elke will send this to Matt)
  7. Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).
  8. Updated drawings of Bcal modules (including O-ring) for discussions. Tim will see if that can be fitted into designer tasks.

Documents to Review

  1. Calibration/monitoring update Athens: Media:APD_vs_tube_linearity.ppt

Tentative Agenda (Emphasis is Calibration)

  1. Announcements
  2. Calibration
  3. FCAL Update
  4. BCAL
    1. Testing of fibers with SiPM readout and Sr90 source (Beni)
    2. Magnetic Field Update (JLab)
    3. Other updates
  5. Any other business

Minutes

Attending: