Difference between revisions of "Dec 8, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from Nov 24 meeting)
(Tentative Agenda (Emphasis is Calibration))
Line 26: Line 26:
 
# BCAL
 
# BCAL
 
## [[Fiber Test with SiPM | Testing of fibers with SiPM readout and Sr90 source]] (Beni)
 
## [[Fiber Test with SiPM | Testing of fibers with SiPM readout and Sr90 source]] (Beni)
## Lead Specification (Elton)
+
## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1130 Lead Specification] (Elton)
 
## Magnetic Field Update (JLab)
 
## Magnetic Field Update (JLab)
 
## Other updates
 
## Other updates

Revision as of 18:19, 5 December 2008

Time: 11:15 ET.

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Nov 24 meeting

  1. Updates on Calibration Specification Table.
  2. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of Bcal on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  3. Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).

Documents to Review

  1. Calibration/monitoring update Athens: Media:APD_vs_tube_linearity.ppt

Tentative Agenda (Emphasis is Calibration)

  1. Announcements
  2. Calibration
  3. FCAL Update
  4. BCAL
    1. Testing of fibers with SiPM readout and Sr90 source (Beni)
    2. Lead Specification (Elton)
    3. Magnetic Field Update (JLab)
    4. Other updates
  5. Any other business

Minutes

Attending: