Difference between revisions of "Dec 8, 2008 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda (Emphasis is Calibration))
(Tentative Agenda (Emphasis is Calibration))
Line 25: Line 25:
 
# FCAL Update
 
# FCAL Update
 
# BCAL
 
# BCAL
## [[Fiber Test with SiPM | Testing of fibers with SiPM readout and Sr90 source]] (Beni)
+
## [[Fiber Test with SiPM | Testing of fibers with SiPM readout and Sr90 source]] (Beni)[http://jlab.org/~zihlmann/fibertes/ScintillationFiberTestsatJlab.ppt |Talk]
 
## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1130 Lead Specification] (Elton)
 
## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1130 Lead Specification] (Elton)
 
## Magnetic Field Update (JLab)
 
## Magnetic Field Update (JLab)

Revision as of 19:09, 5 December 2008

Time: 11:15 ET.

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Nov 24 meeting

  1. Updates on Calibration Specification Table.
  2. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of Bcal on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  3. Report on the Bfield components in the region of the Bcal reaout (JLab for next meeting).

Documents to Review

  1. Calibration/monitoring update Athens: Media:APD_vs_tube_linearity.ppt

Tentative Agenda (Emphasis is Calibration)

  1. Announcements
  2. Calibration
  3. FCAL Update
  4. BCAL
    1. Testing of fibers with SiPM readout and Sr90 source (Beni)|Talk
    2. Lead Specification (Elton)
    3. Magnetic Field Update (JLab)
    4. Other updates
  5. Any other business

Minutes

Attending: