Difference between revisions of "Dec 9, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from previous meeting(s))
(Tentative Agenda)
Line 27: Line 27:
 
   
 
   
 
# Calibration
 
# Calibration
## Calibration/Monitoring minutes: [[Oct 26, 2010 Calibration/Monitoring]]
+
## Requirements for Bcal monitoring (Elton, Zisis and Christina)
## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1640 GlueX-doc-1640] Update on Fcal monitoring (Athens)
+
## Requirements for Bcal monitoring : [http://www.jlab.org/Hall-D/software/wiki/index.php/Sep_2%2C_2008_Calorimetry#Calibration_Specifications_Table Calibration Specifications Table] for BCAL, FCAL, TOF and START (Elton, Zisis and Christina)
+
 
# Announcements
 
# Announcements
 
# Review of Action Items
 
# Review of Action Items

Revision as of 15:49, 8 December 2010

Teleconference Time: 10:30 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.


Items for followup from previous meeting(s)

  1. Monitoring
    • Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
    • IU will provide mechanical drawings to Athens to help design attachment and connection points.
    • IU: checking cross talk of calibration inputs across modules.
  2. Fcal construction
    • Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan.
    • Lubomir to provide references on radiation damage of lead glass.
    • JLab decide on disposition of Fcal cables to free up space at IU.
  3. SiPMs
    • IU: simulation using geometry for summed units

Tentative Agenda

  1. Calibration
    1. Requirements for Bcal monitoring (Elton, Zisis and Christina)
  2. Announcements
  3. Review of Action Items
  4. FCAL
    1. Construction Status
    2. Rad Hard Insert - GlueX-doc-1641 Update on Damage Analysis
  5. BCAL
    1. Construction Status
    2. Readout segmentation