** Steel shields annealed and mu metal installed
 
** Steel shields annealed and mu metal installed
 
** 3 in-oz torque wrench procured
 
** 3 in-oz torque wrench procured
 +
** Josh working on assy
 +
** Additional field test in Dipole
 
* Cooling of blocks - 2.1 KW needed
 
* Cooling of blocks - 2.1 KW needed
 
* Support structure and assy sequence  
 
* Support structure and assy sequence  

Revision as of 12:05, 10 December 2019

Meeting Time and Place =

Tuesday, December 10, 1:30pm At Jefferson Lab, room TED 2504

  • Present - Sasha Somov, Josh Crafts, Eugene, Stephanie, Keith Harding, Tim, Fernando, Chris Stanislav

Agenda

  • Action items from last meeting https://halldweb.jlab.org/wiki/index.php/October_25,_2019_FCAL_Insert_Design_Meeting
  • Discuss Tungsten absorber
    • Cover 1.5 crystals ok?
    • Rohacell supported
  • Monitoring System
    • Testing plan?
    • 1mm fibers - Josh has them
    • 15cm square with 6mm 45 degree bevel - 2 pieces made
    • Diamond end mill procured
  • 12 crystal test setup
    • All hardware fabricated and installed
  • 9 piece Magnetic field test setup
    • Steel shields annealed and mu metal installed
    • 3 in-oz torque wrench procured
    • Josh working on assy
    • Additional field test in Dipole
  • Cooling of blocks - 2.1 KW needed
  • Support structure and assy sequence
  • electronics patch panels DS of crystal pmts
  • Discuss Testing of soldered assembly and mag field testing
  • Discuss test fixture for PMTs in beam

Minutes and Action Items