Difference between revisions of "December 16, 2016 PID Upgrade"
From GlueXWiki
(→Agenda) |
|||
Line 23: | Line 23: | ||
#* Monitoring of bar boxes in transit (Greg) | #* Monitoring of bar boxes in transit (Greg) | ||
# Installation Plan [https://halldweb.jlab.org/wiki/index.php/File:DIRC_Installation_Steps_in_Hall_D.docx Document] (All) | # Installation Plan [https://halldweb.jlab.org/wiki/index.php/File:DIRC_Installation_Steps_in_Hall_D.docx Document] (All) | ||
+ | # Installation views [[Media:Installation_views.pdf]] | ||
# AOB | # AOB |
Revision as of 11:26, 16 December 2016
Meeting Information
GlueX DIRC Meeting
Friday December 16, 2016
11:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Support structure design update
- Optical box design update
- New diaphragm design (Jason)
- Cookie transparency tests (?)
- Shipping/property transfer update
- Monitoring of bar boxes in transit (Greg)
- Installation Plan Document (All)
- Installation views Media:Installation_views.pdf
- AOB