Difference between revisions of "December 16, 2016 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 23: Line 23:
 
#* Monitoring of bar boxes in transit (Greg)
 
#* Monitoring of bar boxes in transit (Greg)
 
# Installation Plan [https://halldweb.jlab.org/wiki/index.php/File:DIRC_Installation_Steps_in_Hall_D.docx Document] (All)
 
# Installation Plan [https://halldweb.jlab.org/wiki/index.php/File:DIRC_Installation_Steps_in_Hall_D.docx Document] (All)
 +
# Installation views [[Media:Installation_views.pdf]]
 
# AOB
 
# AOB

Revision as of 11:26, 16 December 2016

Meeting Information

GlueX DIRC Meeting
Friday December 16, 2016
11:00 am, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Support structure design update
  2. Optical box design update
    • New diaphragm design (Jason)
    • Cookie transparency tests (?)
  3. Shipping/property transfer update
    • Monitoring of bar boxes in transit (Greg)
  4. Installation Plan Document (All)
  5. Installation views Media:Installation_views.pdf
  6. AOB