Difference between revisions of "December 16, 2022 Tech group meeting"
From GlueXWiki
(Created page with "= Meeting Time and Place == Friday December 16, 2022 9:30am TED 2559 and Teams == Agenda == * Safety - * Mark's last meeting... * New WC * New Deputy WC position posted *...") |
(→Agenda) |
||
Line 49: | Line 49: | ||
* On Call - | * On Call - | ||
* ePAS Training and trial https://www.jlab.org/esh/epas | * ePAS Training and trial https://www.jlab.org/esh/epas | ||
+ | * Offsite gathering | ||
== Action Items == | == Action Items == |
Latest revision as of 08:17, 16 December 2022
Meeting Time and Place =
Friday December 16, 2022 9:30am TED 2559 and Teams
Agenda
- Safety -
- Mark's last meeting...
- New WC
- New Deputy WC position posted
- January Schedule 3rd-12th
- Get DIRC operational
- Install new .o18 orifice with radiator
- Fill optical boxes
- Modify Tagger Microscope
- Install New Profiler
- Remove and replace ComCal
- Install GEM
- BCAL/FDC chiller swap
- Air compressor relief test
- Goniometer run through axis
- Target mod for hydrogen
- Get DIRC operational
- Hall D current Tasks
- FCAL Insert Module fabrication - complete
- FCAL2 Design tidbits
- Monitoring panel discussion - Stephanie
- Cabling/patch panels
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass, outer plexiglass
- Tungsten
- Insulation
- Man lifts
- Electronic patch panels
- Liftable frame mods
- Cable trays
- drip pan
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks - S&A completed upper half
- Epoxy fittings to Cooling Manifold
- Weld water manifold supports
- Bend/solder copper tubes - complete
- Epoxy fittings to tubes and leak check
- JBweld conductive epoxy tubes to blocks
- HDList updates - weekly!
- KLONG dwgs
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas
- Offsite gathering