Difference between revisions of "December 17, 2018 DIRC"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday December 17, 2018<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room...")
 
Line 3: Line 3:
 
Monday December 17, 2018<br>
 
Monday December 17, 2018<br>
 
1:00 pm, EDT<br>
 
1:00 pm, EDT<br>
JLab room A110<br>
+
JLab room F326<br>
  
 
== Connection Using Bluejeans ==
 
== Connection Using Bluejeans ==

Revision as of 09:56, 17 December 2018

Meeting Information

GlueX DIRC Meeting
Monday December 17, 2018
1:00 pm, EDT
JLab room F326

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Optical box
    • Fabrication status update (Ernie and Jason)
      • Dark box enclosure: testing at Bates and delivered to JLab (Jason)
      • Quartz window RTV after measurement of lower box at JLab. Delivery schedule? (Ernie)
        • Plexiglass backup (Justin/Tim)
    • LED fiber feedthroughs and diffuser
      • Fiber mount location (Bill/Stephanie)
    • Testing at JLab:
      • Laser alignment test in ESB (Bill)
      • Darkbox and airflow tests (All)
    • Installation schedule (Tim)
  3. Software/simulations
    • Finalizing DIRC "as-built" geometry: bar box internals, etc. (Yunjie)
    • LED generator and timing calibration (Yunjie)
    • Time-based studies and adding # photons to LUT likelihood (Maria)
    • Alignment updates (Cris)
    • Software overview and tasks (All)
  4. Addressing ERR review recommendations
    • Recommendations pertaining to DIRC commissioning should be addressed before installation.
  5. AOB