Difference between revisions of "December 21, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 21: Line 21:
 
#** [https://logbooks.jlab.org/entry/3860461 Glass sample tests]
 
#** [https://logbooks.jlab.org/entry/3860461 Glass sample tests]
 
#** [https://logbooks.jlab.org/entry/3860659 UVE+borosilicate sample tests]
 
#** [https://logbooks.jlab.org/entry/3860659 UVE+borosilicate sample tests]
#* Reflectivity measurements vs wavelength  
+
#* Reflectivity measurements vs wavelength at 45 degrees in air: [https://halldweb.jlab.org/wiki/index.php/File:Reflectivity45.png] and zoomed version [https://halldweb.jlab.org/wiki/index.php/File:ReflectivityZoom45.png]
 
#* Other thoughts or suggestions?
 
#* Other thoughts or suggestions?
 
# Diffuser sealing update (Bill)
 
# Diffuser sealing update (Bill)

Revision as of 13:58, 21 December 2020

Meeting Information

GlueX DIRC Meeting
Monday December 21, 2020
1:00 pm, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Mirror prototype test plan (All)
  3. Diffuser sealing update (Bill)
  4. DIRC commissioning analyses and 2020 studies (All)
    • Spring 2020 data production status (Justin)
      • DIRC trees located at /volatile/halld/home/gxproj7/RunPeriod-2019-11/recon/ for batches 1-4 is half of full statistics
    • Geometric reconstruction update (Ahmed/Roman)
      • Update on shift of the time difference
      • Cherenkov PDF
    • Per LED Photon monitoring overtime (Bill)
    • FastDIRC update (Yunjie)
  5. Follow-up on additional action items from workfest (All)
  6. AOB