Participants: Curtis, Naomi, Eugene, Beni, Mark, and Lubomir.
FDC Update
Lubomir reported on FDC construction and presented gas gain measurements and Garfield calculations for several Ar/CO2/CH4 mixtures.
CDC Update
Curtis gave an update on the construction status:
- The spec for the electrical hookups is undergoing discussion.
- The 7th row of straws is nearly complete. The 8th row will be started after the holiday break and will complete that block of stereo straws. Curtis is to be trained in straw fitting training this afternoon as a contingency worker because installing the straws requires 3 people working together. (Curtis and Naomi both did this). It takes about 1.5h to install 30 straws. Most of the other steps in the construction just require 1 person at a time.
- The plastic feedthrus and donuts have been checked with 100% acceptance. About half of the pin-holders have been checked; all but one (which was squashed) have been accepted. The accepted parts have been cleaned and are in storage in the cleanroom.
- After the first batch of straws, no more resistance issues have been encountered. The resistance of each straw (+donut+feedthru) assembly glued into the chamber has been acceptable.
- We are waiting to hear a date for delivery of the next batch of straws.