Difference between revisions of "December 3, 2020 CPP Design Meeting"
From GlueXWiki
(→Minutes and Action Items) |
(→Minutes and Action Items) |
||
Line 18: | Line 18: | ||
== Minutes and Action Items == | == Minutes and Action Items == | ||
* Request for ERR submitted | * Request for ERR submitted | ||
− | * Need Safety documents | + | * We need to show that everything is in place for a successful experiment |
+ | ** Design status | ||
+ | ** Procurement schedule/status | ||
+ | ** Installation schedule | ||
+ | *** For installing prior to 2022 run - full detector then uninstall a portion to run Primex | ||
+ | *** For Installing in middle of 2022 run | ||
+ | ** Installation procedure | ||
+ | ** Manpower availability | ||
+ | ** Calibration and Analysis procedures | ||
+ | ** Need Safety documents | ||
+ | ** OSP | ||
+ | ** Installation procedure/HDlist |
Revision as of 16:04, 7 December 2020
Meeting Time and Place
Thursday Dec 03, 2020, 2pm Bluejeans https://bluejeans.com/465620466
- Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S
Agenda
- Readiness Review
- Schedule Media:CPP_Schedule.pdf
- Design/Procurement status
- Things to work out
- Gas line manifold
- Complete structural analysis
- Develop Detailed installation plan
- Develop Design/operational/Maintenance Requirements
Minutes and Action Items
- Request for ERR submitted
- We need to show that everything is in place for a successful experiment
- Design status
- Procurement schedule/status
- Installation schedule
- For installing prior to 2022 run - full detector then uninstall a portion to run Primex
- For Installing in middle of 2022 run
- Installation procedure
- Manpower availability
- Calibration and Analysis procedures
- Need Safety documents
- OSP
- Installation procedure/HDlist