Difference between revisions of "December 3, 2020 CPP Design Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes and Action Items)
(Minutes and Action Items)
Line 18: Line 18:
 
== Minutes and Action Items ==
 
== Minutes and Action Items ==
 
* Request for ERR submitted
 
* Request for ERR submitted
* Need Safety documents, installation plan etc..
+
* We need to show that everything is in place for a successful experiment
 +
** Design status
 +
** Procurement schedule/status
 +
** Installation schedule
 +
*** For installing prior to 2022 run - full detector then uninstall a portion to run Primex
 +
*** For Installing in middle of 2022 run
 +
** Installation procedure
 +
** Manpower availability
 +
** Calibration and Analysis procedures
 +
** Need Safety documents
 +
** OSP
 +
** Installation procedure/HDlist

Revision as of 16:04, 7 December 2020

Meeting Time and Place

Thursday Dec 03, 2020, 2pm Bluejeans https://bluejeans.com/465620466

  • Present - Elton, Dave, Stephanie, Ilya, Rory, Mark S

Agenda

  • Things to work out
    • Gas line manifold
    • Complete structural analysis
    • Develop Detailed installation plan
    • Develop Design/operational/Maintenance Requirements

Minutes and Action Items

  • Request for ERR submitted
  • We need to show that everything is in place for a successful experiment
    • Design status
    • Procurement schedule/status
    • Installation schedule
      • For installing prior to 2022 run - full detector then uninstall a portion to run Primex
      • For Installing in middle of 2022 run
    • Installation procedure
    • Manpower availability
    • Calibration and Analysis procedures
    • Need Safety documents
    • OSP
    • Installation procedure/HDlist