Difference between revisions of "December 5, 2012 tracking CDC/FDC"
From GlueXWiki
(→Minutes) |
(→Minutes) |
||
Line 29: | Line 29: | ||
Present: Curtis, Naomi, Beni, Eugene, Simon, Elton, Mark | Present: Curtis, Naomi, Beni, Eugene, Simon, Elton, Mark | ||
#FDC Update | #FDC Update | ||
+ | ## Package 1: completely ready for testing; ground,cooling and HV wiring ready. | ||
+ | ## Package 2: working on all missing cathodes; will install half of it before Christmas | ||
+ | ## Package 3: has been tested; estimate ~230 micron resolution from the timing from the wires | ||
+ | ## Package 4: has been completely assembled and tested with a source; we found and fixed a broken wire. | ||
#CDC Update | #CDC Update |
Revision as of 16:47, 5 December 2012
Meeting Time and Place
Wednesday December 5, 2012 at 11:00am At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone, dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Hardware Agenda
- Announcements
- FDC Update
- CDC Update
- Calibrations
Minutes
Present: Curtis, Naomi, Beni, Eugene, Simon, Elton, Mark
- FDC Update
- Package 1: completely ready for testing; ground,cooling and HV wiring ready.
- Package 2: working on all missing cathodes; will install half of it before Christmas
- Package 3: has been tested; estimate ~230 micron resolution from the timing from the wires
- Package 4: has been completely assembled and tested with a source; we found and fixed a broken wire.
- CDC Update