(Created page with "__TOC__ == Meeting Time and Place == Friday, December 6, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326 == Connections == To connect from the outside, plea...")
 
(Agenda)
Line 27: Line 27:
  
 
# Announcements
 
# Announcements
# Updates to the Mechanical Installation Schedule ([[Media:Nov 8 2013 Install Schedule.pdf | Nov 8 Rendition of Install Schedule]]) (Tim)
+
# Updates to the Mechanical Installation Schedule ([[Media:Dec 2013 Install Schedule.pdf | Dec Rendition of Install Schedule]]) (Tim)
 
# Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
 
# Electronics Installation Schedule (Fernando) [[https://halldweb1.jlab.org/wiki/index.php/Status_%26_Schedules | Schedule]]
 
#* Readiness of controls
 
#* Readiness of controls

Revision as of 12:48, 6 December 2013

Meeting Time and Place

Friday, December 6, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone (supported on request only) dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Desktop Sharing

You can view the computer desktop in the meeting room at JLab via the web.

  1. Go to http://esnet.readytalk.com
  2. In the "join a meeting" box enter the Hall D code: 3421244
  3. Fill in the participant registration form.

Up to GlueX/Hall-D Installation Meetings

Action Items From Last Meeting

Agenda

  1. Announcements
  2. Updates to the Mechanical Installation Schedule ( Dec Rendition of Install Schedule) (Tim)
  3. Electronics Installation Schedule (Fernando) [| Schedule]
    • Readiness of controls
  4. Beam Commissioning Plan Reviews Sequence (Elton)
  5. Installation Updates (Not a construction report)
    • Counting House Infrastructure
    • Trigger and DAQ Installation
    • Slow Control Installation
    • Tagger Magnet Installation
    • BCAL Installation
    • FCAL Installation
    • FDC Installation
    • CDC Installation
    • TOF Installation
    • Start Counter Installation
    • Microscope Installation
    • Tagger Array Installation
    • Pair Spectrometer Installation
  6. A.O.B.