Difference between revisions of "December 7, 2020 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 19: Line 19:
 
# South OB mirror box removal and evaluation (Bill, All)
 
# South OB mirror box removal and evaluation (Bill, All)
 
#* UV dye test [https://logbooks.jlab.org/entry/3859182 Friday] and [https://logbooks.jlab.org/entry/3859248 Monday] (Bill)
 
#* UV dye test [https://logbooks.jlab.org/entry/3859182 Friday] and [https://logbooks.jlab.org/entry/3859248 Monday] (Bill)
#* Reflectivity setup (Bill)
 
 
#* One mirror (bottom plate) removed from the strong back: [https://logbooks.jlab.org/entry/3859251 mirror and glass separated with residual DP270]
 
#* One mirror (bottom plate) removed from the strong back: [https://logbooks.jlab.org/entry/3859251 mirror and glass separated with residual DP270]
 +
#* Reflectivity setup (Bill)
 
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All)
 
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All)
 
#* Discussion of assembled prototypes
 
#* Discussion of assembled prototypes

Revision as of 13:51, 7 December 2020

Meeting Information

GlueX DIRC Meeting
Monday December 7, 2020
1:00 pm, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. South OB mirror box removal and evaluation (Bill, All)
  3. Mirror prototype test plan (All)
  4. Diffuser sealing update (Bill)
  5. Replacement module tested (Bill)
  6. DIRC commissioning analyses and 2020 studies (All)
  7. Follow-up on additional action items from workfest (All)
    • 100M event MC samples required for ρ and φ data/MC comparisons:
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
  8. AOB