December 7, 2020 DIRC

From GlueXWiki
Revision as of 13:01, 7 December 2020 by Jrsteven (Talk | contribs) (Agenda)

Jump to: navigation, search

Meeting Information

GlueX DIRC Meeting
Monday December 7, 2020
1:00 pm, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. South OB mirror box removal and evaluation (Bill, All)
    • UV dye test Friday and Monday (Bill)
    • Reflectivity setup (Bill)
    • One mirror (bottom plate) removed from the strong back, similar challenge to remove as previous attempts
  3. Mirror prototype test plan (All)
    • Discussion of assembled prototypes
    • Other thoughts or suggestions?
  4. Diffuser sealing update (Bill)
  5. DIRC commissioning analyses and 2020 studies (All)
  6. Follow-up on additional action items from workfest (All)
    • 100M event MC samples required for ρ and φ data/MC comparisons:
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
      • /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
  7. AOB