Difference between revisions of "Eta Decay Width Measurements via Primakoff Effect"

From GlueXWiki
Jump to: navigation, search
(Production, Fall 2022)
(One intermediate revision by one other user not shown)
Line 48: Line 48:
  
 
*[[List of Runs 2022]]
 
*[[List of Runs 2022]]
 +
 +
*[[Runs to study systematics]]
  
 
== Hall D PrimEx Meetings ==
 
== Hall D PrimEx Meetings ==
Line 64: Line 66:
  
 
* [[PrimEx (informal) Calibration & Analysis Meeting]]
 
* [[PrimEx (informal) Calibration & Analysis Meeting]]
 +
 +
== Hall D PrimEx data reconstruction ==
 +
 +
* [[PrimEx-eta data reconstruction]]
  
 
== Hall D PrimEx simulations ==
 
== Hall D PrimEx simulations ==

Revision as of 15:36, 24 December 2022


Experiment Readiness Review 2017

Compton Calorimeter (CCAL)

Targets

Upgrade of the FCAL

Production Rate Estimation for Compton and Primakoff


Commissioning, Fall 2018

Production, Spring 2019

Production, Fall 2021

Production, Fall 2022

Hall D PrimEx Meetings

Hall D PrimEx data reconstruction

Hall D PrimEx simulations