Difference between revisions of "FCAL Beamtest Setup Pictures"

From GlueXWiki
Jump to: navigation, search
Line 14: Line 14:
 
[[File:Electronics.jpg|600px|thumb|left|Electronics for trigger.]]
 
[[File:Electronics.jpg|600px|thumb|left|Electronics for trigger.]]
 
[[File:trigger_box_with_triggers.jpg|600px|thumb|left|Final layout of trigger box.]]
 
[[File:trigger_box_with_triggers.jpg|600px|thumb|left|Final layout of trigger box.]]
[[File:trigger_box_upclose.jpg|600px|thumb|left|Upclose view of trigger box.]]
+
[[File:Trigger_box_upclose.JPG|600px|thumb|left|Upclose view of trigger box.]]

Revision as of 12:18, 3 November 2011

Setup for FCAL Beamtest in Hall B 2011 Fall

(Click to enlarge)

Outside view of detector housing 25 modules.
Another outside view of detector.
Side view of detector.
Inside of detector.
Connection for back panel. Align red arrow and red line for best fit.
Connection for front panel. Align red arrow and red line for best fit.
Dark box containing trigger scintillators.
File:Detector back.jpg
Back side of detector, showing end of bases.
File:Detector front.jpg
Front of detector, showing lead glass modules.
File:Electronics.jpg
Electronics for trigger.
File:Trigger box with triggers.jpg
Final layout of trigger box.
Upclose view of trigger box.