Visual inspection of lead glass modules
Repairing of lead glass modules
Lead glass PMT and dividers
Rearranging FCAL cables
FCAL2 Crates
Distribution of signals and voltages
Testing and labeling cables
Removing FCAL cables from the detector
Work space in Hall D
Stacking FCAL2 modules
Testing ECAL modules
Testing of PMT dividers
Installing dividers
Detector Alignment
List of tasks and manpower
Summer Students (2023)
Detector Photos
HyCal in Hall B
Status of the insert fabrication