(Global documents)
Line 13: Line 13:
  
 
===== Global documents =====
 
===== Global documents =====
 
+
[http://www.jlab.org/Hall-D/reviews_material/FDC_Readiness_Review_Mar_31_2011/Pre-Brief%20Materials/Procedures/D000000103P036.pdf Clean Room Procedures]
 
+
  
 
===== Wire Frame Construction =====
 
===== Wire Frame Construction =====

Revision as of 17:46, 28 March 2011

The GlueX FDC

Overview

Construction

Details of the FDC Construction

Global documents

Clean Room Procedures

Wire Frame Construction

These documents contain all steps involved to build the wire frame including the steps after stringing:

D000000103P012

D000000103P013

D000000103P015

D000000103P018

D000000103P020

D000000103P024

D000000103P025

D000000103P026

D000000103P027

D000000103P029

D000000103P035

Cathode Construction

These documents contain all steps in the fabrication of the cathode foil and ground planes, gluing onto the cathode frame, and soldering rigid-flex assemblies:

D000000103P001

D000000103P002

D000000103P003

D000000103P004

D000000103P005

D000000103P006

D000000103P009

Cathode Plane Construction

These documents contain all steps involved in the cathode plen construction including critical steps like soldering the rigid flex foils and gluing the ground plane.

Stack Assembly

These documents contain all steps involved to assemble the FDC package.