Revision history of "Fall 2019 DIRC Commissioning"

From GlueXWiki
Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)
  • (cur | prev) 09:39, 17 October 2019Jrsteven (Talk | contribs). . (7,478 bytes) (+7,478). . (Created page with " == Expected Conditions == * Beam energy expected 11.6 GeV * Solenoid on at 1350A * CW Beam current: ** Range: 50 nA - 600 nA. 250 MHz frequency. ** Typical low-intensity...")
(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)