Difference between revisions of "Fall 2019 TRD/GEM Commissioning"

From GlueXWiki
Jump to: navigation, search
(General logbook entries:)
(General logbook entries:)
Line 4: Line 4:
 
* [https://logbooks.jlab.org/entry/3746828 FCAL trigger configuration]
 
* [https://logbooks.jlab.org/entry/3746828 FCAL trigger configuration]
 
* Lubomir's status on 12/5/19: [https://logbooks.jlab.org/entry/3746870 before access] and [https://logbooks.jlab.org/entry/3747274 after access]
 
* Lubomir's status on 12/5/19: [https://logbooks.jlab.org/entry/3746870 before access] and [https://logbooks.jlab.org/entry/3747274 after access]
 +
* Drift voltage on wire TRD turned off on 12/12/19: [https://logbooks.jlab.org/entry/3752388]
  
 
==== Straight-track data ====
 
==== Straight-track data ====

Revision as of 18:10, 14 December 2019

General logbook entries:

Straight-track data

  • For alignment of the GEM/TRD we need to acquire production samples with the magnetic field off
  • Straight-track sample at each of the 3 TRD positions with the full GEM readout for tracking and alignment studies

Full GEM readout: tracking mode

  • The electronics for three of the GEM packages are readout limited to ~3kHz
  • At least one large dataset at each of the 3 TRD positions will be required with the full readout for tracking and alignment studies with the full solenoid field
    • Beam CENTER: Runs 70951-70992 taken with FCAL_TRACK_CENTER configuration
      • Logbook entries: Good runs [3] [4], and lost data [5]
    • Beam LEFT: Runs 71013-????? taken with FCAL_TRACK_LEFT configuration
      • Logbook entries: Argon gas [6] and TRD runs with Xenon gas ?????

Note: Data from Runs 70850-70895 were lost due to data transfer mistake. So although they may have events listed in RCDB, the data are not available.