Difference between revisions of "Fcal Fabrication Readiness Review"

From GlueXWiki
Jump to: navigation, search
 
Line 1: Line 1:
'''<font color=red size=3>BCAL Fabrication Readiness Review</font>'''
+
'''<font color=red size=3>FCAL Fabrication Readiness Review</font>'''
  
 
* ESNET and EVO session
 
* ESNET and EVO session
Line 13: Line 13:
  
 
= Topics/Issues that need discussion/resolution =
 
= Topics/Issues that need discussion/resolution =
# Schedule, revision of any milestones based on present projections
 
# Feedback to Vendors (Kuraray, Vulcan)
 
# Lessons learned from construction prototype
 
# Training of personnel, especially transitions between work periods
 
# Testing
 
# Shipping
 
## Handling of crates/number of crates to build
 
## Timing of shipments including considerations of winter weather
 
# Billing and invoicing guidelines
 
# JLab:
 
## Information/feedback required from JLab?
 
## Plan for storage space at JLab for completed modules
 
## Plan at JLab for testing of finished modules?
 
  
 
= Documents to Review=
 
= Documents to Review=
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1372 Regina Documentation]
 
# [http://web.me.com/zisis/bcal Regina Bcal Web Page]
 
# [http://web.me.com/zisis/bcal_reports Bcal Fabrication Reports]
 
# [[Nov 3-5, 2009 Calorimetry Backup]]
 
  
 
= Itineraries =
 
= Itineraries =
* Elton Smith and Tim Whitlatch:
 
** Arrive: UA flight 5806 Tue Nov 3 at 03:05 PM.
 
** Depart: AC flight 1116 Thu Nov 5 at 11:25 AM
 
* Bruce Lenzer and Michael Martin:
 
** Arrive: DL flight 2628 Tue Nov 3 at 01:48 PM
 
** Depart: DL flight 3622 Thu Nov 5 at 06:53 AM
 
* <font color=purple>Directions to</font> [http://maps.google.com/maps?f=d&source=s_d&saddr=50.432853,-104.653358&daddr=4255+Albert+St,+Regina,+SK+S4S+3R6,+Canada+%28Holiday+Inn+Express+Hotel+%26+Suites+Regina-South%29&hl=en&geocode=%3BFboyAQMdNqjD-SGFLU_gMDJuag&mra=dme&mrcr=0&mrsp=0&sz=14&vps=4&jsv=182b&sll=50.426675,-104.641428&sspn=0.039697,0.071926&num=10 Holiday Inn Express]
 
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 12:13, 3 March 2010

FCAL Fabrication Readiness Review

  • ESNET and EVO session
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Venue

Topics/Issues that need discussion/resolution

Documents to Review

Itineraries

Tentative Agenda

Tuesday, November 3

  • 16:15 - Pickup at hotel
  • 16:30 - Tour
    1. Detector Lab
      • Lab Building, Room 127
      • Fiber testing: attenuation length and photoelectron stations
      • Fiber analysis and QA checks
    2. Construction Lab
      • Lab Building, Room 113
      • Module inspection and testing method
      • Fiber sorting
      • Lead swaging
      • Press inspection
      • Matrix assembly
    3. Graduate Student Office
      • Lab Building, Room 114
      • A quick hello
  • 18:00 - Adjourn
  • 18:15 - Dinner at The KEG Steakhouse
    • Directions: The KEG is just in front of the Holiday Inn Express

Wednesday, November 4

  • 08:30 - Arrival
  • 09:00 - Project Presentation and Discussion
    • Lab Building, Room 237 (open session)
  1. Status of project
  2. Lessons learned from construction prototype
  3. Training of personnel, especially transitions between work periods
  4. Testing
    • Fibers
    • Lead
    • Matrix
  • 10:30 - Coffee and Meeting
    • Lab Building, Room 239
    • Meet with Dr. David Malloy (Director) and Helen Yum (Contract Officer) from the Office of Research Services
  • 11:00-12:00 - Tour of Ross Machine shop (Lenzer, Martin, Kolybaba)
  • 10:50 - Contractual
  1. Contract
  2. Procurement
  3. Billing and invoicing
  4. Official schedule and tracking
  • 12:00 - Lunch
    • University Club, College West, Room 215
  • 13:15 - Meet with the Dean of Science
    • Lab Building, Room 237 (closed session)
  • 13:45 - Contract Requirements
    • Lab Building, Room 237 (closed session)
  1. Final Construction Plan
  2. Final Acceptance Test Plan
  3. Quality Assurance Plan
  4. Feedback and questions from QA team
  • 15:15 - Coffee
    • Lab Building, Room 239
  • 15:45 - Logistics
    • Lab Building, Room 237 (closed session)
  1. Shipping
  2. Storage requirements at Regina and JLab
  3. Handling of crates/number of crates to build
  4. Timing of shipments including considerations of winter weather
  5. Schedule
  • 17:00 - Adjourn
  • 17:30 - Dinner at Grekos
    • Directions to [ restaurant]

Thursday Nov 5

  • Directions to Ross Machine Shop
  • 08:00 - Tour of Ross Machine Shop
  • 09:00 - Return to UofR for wrap up
  • 10:00 - Departure to airport