Difference between revisions of "Feb. 22, 2008 Tracking CDC/FDC"
From GlueXWiki
(→Agenda) |
|||
Line 4: | Line 4: | ||
# EM Background rates (David) | # EM Background rates (David) | ||
# Status of Kinematic Fitting (Matt) | # Status of Kinematic Fitting (Matt) | ||
+ | ## Signal Leakage in pi/K (new studies) [http://argus.phys.uregina.ca/gluex/DocDB/0009/000971/002/Bellis_piKseparation_II.pdf pi/K Separation (GlueX doc-971)] | ||
+ | ## Previous talk [http://argus.phys.uregina.ca/gluex/DocDB/0009/000971/002/Bellis_piKseparation.pdf pi/K Separation (GlueX doc-971)] | ||
# Status of PWA anchoring (Paul, Alexander?) | # Status of PWA anchoring (Paul, Alexander?) | ||
# CDC Hardware Status | # CDC Hardware Status | ||
# FDC Hardware Status | # FDC Hardware Status | ||
− | |||
==Participating== | ==Participating== |
Revision as of 01:42, 22 February 2008
Agenda
- Status of MC resolution studies (David)
- EM Background rates (David)
- Status of Kinematic Fitting (Matt)
- Signal Leakage in pi/K (new studies) pi/K Separation (GlueX doc-971)
- Previous talk pi/K Separation (GlueX doc-971)
- Status of PWA anchoring (Paul, Alexander?)
- CDC Hardware Status
- FDC Hardware Status
Participating
Location
The meeting will be at 11:00am in Cebaf Center F324-325.
Telephone
To connect by telephone: 1.) dial:
800-377-8846 : US 888-276-7715 : Canada 302-709-8424 : International (not a free call!)
2.) enter participant code: 39527048# (remember the "#")
Video Conferencing
The room at JLab does not have video conferencing equipment installed.
Minutes
Attendees: TBD