Difference between revisions of "Feb 12, 2013 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Created page with "''<font color=red>Teleconference Time: 11:00 a.m. EST</font>'' * <font color=green>ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)</font> ** [[Video ...")
 
(Items for followup from previous meeting(s))
Line 17: Line 17:
 
=Items for followup from previous meeting(s)=
 
=Items for followup from previous meeting(s)=
  
# <strike> Produce plots of SiPM parameters, such as the ones already shown, for Vover=1.0, 1.1 V (Orlando) </strike> Plots showed last week at the Bcal Readout meeting.
 
 
# After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
 
# After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
 
+
# Fcal: JLab to provide feedback (approval) on dark box construction (Tim and Chuck)
  
 
= Tentative Agenda =
 
= Tentative Agenda =

Revision as of 09:20, 31 January 2013

Teleconference Time: 11:00 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6460 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

Items for followup from previous meeting(s)

  1. After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
  2. Fcal: JLab to provide feedback (approval) on dark box construction (Tim and Chuck)

Tentative Agenda

  1. Announcements
  2. Collaboration Meeting
    1. Friday February 22, 2013.
    2. 10:55 Session Ic (100) --- Calorimetry - (Organizer: Matt Shepherd) - Chair:
    3. Suggested topics (from Bcal readout meeting) are
      • Bcal production including testing
      • Fcal Update including lead glass stacking
      • Summary of SiPM testing (USM)
      • Monitoring (Bcal production and Fcal status)# Review of Action Items
  3. Monitoring: Media:UpdateFCALJan2013.pdf
  4. FCAL
  5. BCAL
  6. USM
  7. Simulations
  8. TDR update
  9. Calibration of Calorimeters
  10. Any other business

Minutes

Attendees: