Existing (old) outline
  
 
# Global Design
 
# Global Design
Line 53: Line 55:
  
 
Proposed outline for revised section
 
Proposed outline for revised section
 +
 
# Global Design
 
# Global Design
 
#Forward Calorimeter
 
#Forward Calorimeter

Revision as of 12:16, 3 February 2012

Teleconference Time: 11:00 a.m. EST'

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Participant Direct Lines

  • JLab Phone: in CC F326 is 757-269-6337 (usual room)
  • JLab Phone in CC L207 is 757-269-7084
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947


Items for followup from previous meeting(s)

  1. Monitoring
    • Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication
  2. TDR
    • Create outline to assign writing homework (Elton)

Draft outline

Existing (old) outline

  1. Global Design
  2. Forward Calorimeter
    • The E852 Experience
    • The RadPhi Experience
    • Estimating the GlueX pi0 and eta Mass Resolution
    • Electromagnetic Backgrounds
    • Radiation Damage
    • Heat Curing of Damaged Blocks
    • Assessing Lead Glass Blocks and PMT's
      • Lead glass block evaluation
      • PMT Evaluation
    • Other Issues
      • Electromagnetic Rates in the LGD
      • Magnetic Shielding
      • Monitoring
      • Calibration
      • Triggering
  3. Barrel Calorimeter
    • Design Considerations
    • Pb/Sci Barrel Calorimeter
    • The GlueX BCAL
    • Construction of Prototype Modules
      • Production of Lead Sheets
      • Module Construction
    • Scintillating Fiber Tests
    • Fiber Light Transmission Tests
    • Silicon Photomultiplier Test

Proposed outline for revised section

  1. Global Design
  2. Forward Calorimeter
    • The E852 Experience
    • The RadPhi Experience
    • Estimating the GlueX pi0 and eta Mass Resolution
    • Electromagnetic Backgrounds
    • Radiation Damage
    • Heat Curing of Damaged Blocks
    • Assessing Lead Glass Blocks and PMT's
      • Lead glass block evaluation
      • PMT Evaluation
    • Other Issues
      • Electromagnetic Rates in the LGD
      • Magnetic Shielding
      • Monitoring
      • Calibration
      • Triggering
  3. Barrel Calorimeter
    • Geometry
    • Module construction
      • Scintillating fibers
      • Lead
      • Fabrication
    • Readout
      • SiPMs
      • Operation (e.g. temp compensation etc)
    • Prototypes and tests
    • Calibration and Monitoring
    • Expected Performance

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Collaboration Meeting
    1. Friday at 2:30pm, 4 30 minute talks.
  4. Monitoring.
  5. FCAL
    1. Construction Status: mechanical, bases (notes from Matt)
    2. Beam tests in Hall B (John)
  6. BCAL
    1. BCAL Beam Tests 2012
  7. USM update
  8. TDR update
    1. Instructions for the TDR (You must be logged into the wiki to access this page).
    2. We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. The old outline is the following
  9. Simulations/Reconstruction
  10. Any other business

Minutes

Attending: