Difference between revisions of "Feb 17, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
 
Line 4: Line 4:
 
* JLab Phone: in CC F326 is 757-269-6337
 
* JLab Phone: in CC F326 is 757-269-6337
 
* Regina Phone: in LB228 is 306-585-4204
 
* Regina Phone: in LB228 is 306-585-4204
* Athens Phone: in Christina's office is 011-30-210-727-6947
+
* Athens Phone: in Christina's office is 011-30-210-727-6947  
* Phone only if requested:
+
* Phone connection only upon request.
** +1-800-377-8846 : US
+
** +1-866-740-1260 : US+Canada
** +1-888-276-7715 : Canada
+
** +1-303-248-0285 : International
** +1-302-709-8424 : International
+
** then enter participant code: 3421244# (remember the "#").  
** then enter participant code: 77438230# (remember the "#"). Phone line by request only.
+
Phone connection only upon request.
 
+
** or www.readytalk.com (and code without the #)
  
 
=Items for followup from previous meeting(s)=
 
=Items for followup from previous meeting(s)=

Revision as of 11:51, 16 February 2011

Teleconference Time: 10:30 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").

Phone connection only upon request.

    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
    • IU: checking cross talk of calibration inputs across modules.
  2. Fcal construction
    • Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan.
    • Zisis/George to send Elton shipping specifications as example for specifying Pb shipments
    • Mechanical: Tim has promised review of support structure.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL
    1. Construction Status
  5. BCAL
    1. Construction Status
  6. Simulations
    1. Readout segmentation (summing, towers vs quadrants/blocks)
    2. Reconstruction
  7. Other Updates

Minutes

Attending: