Difference between revisions of "Feb 17, 2011 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
Line 31: Line 31:
 
# Simulations
 
# Simulations
 
## Readout segmentation (summing, towers vs quadrants/blocks)
 
## Readout segmentation (summing, towers vs quadrants/blocks)
## Reconstruction
+
## Reconstruction: [http://www.jlab.org/~semenov/meeting110217.pdf Study of Segmentation with BCal Reconstruction Code]
 
# Other Updates
 
# Other Updates
  
 
=Minutes=
 
=Minutes=
 
''Attending:
 
''Attending:

Revision as of 10:34, 17 February 2011

Teleconference Time: 10:30 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
    • IU: checking cross talk of calibration inputs across modules.
  2. Fcal construction
    • Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan.
    • Zisis/George to send Elton shipping specifications as example for specifying Pb shipments
    • Mechanical: Tim has promised review of support structure.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL
    1. Construction Status
  5. BCAL
    1. Construction Status
  6. Simulations
    1. Readout segmentation (summing, towers vs quadrants/blocks)
    2. Reconstruction: Study of Segmentation with BCal Reconstruction Code
  7. Other Updates

Minutes

Attending: