Feb 17, 2011 Calorimetry

From GlueXWiki
Revision as of 15:20, 17 February 2011 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Teleconference Time: 10:30 a.m. EST

  • ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
  • JLab Phone: in CC F326 is 757-269-6337
  • Regina Phone: in LB228 is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947
  • Phone connection only upon request.
    • +1-866-740-1260 : US+Canada
    • +1-303-248-0285 : International
    • then enter participant code: 3421244# (remember the "#").
    • or www.readytalk.com (and code without the #)

Items for followup from previous meeting(s)

  1. Monitoring
    • Specifications for BCAL Monitoring R&D (Zisis, Elton, Christina)
    • Zisis will gather Andrei's tests and overall ideas for BCAL monitoring system.
    • IU: checking cross talk of calibration inputs across modules.
  2. Fcal construction
    • Matt to provide optimum schedule for shipping completed blocks to JLab based on technician work plan.
    • Zisis/George to send Elton shipping specifications as example for specifying Pb shipments
    • Mechanical: Tim has promised review of support structure.

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration
  4. FCAL
    1. Construction Status: mechanical, bases
  5. BCAL
    1. Construction Status: builds, fibre QA
  6. Simulations
    1. Readout segmentation (summing, towers vs quadrants/blocks)
    2. Reconstruction: Study of Segmentation with BCal Reconstruction Code
  7. Other Updates

Splitoffs discussion:

  • slides (from May 2010 collab. meeting)

Minutes

Attending:

Attending: Elton, Yi, tim, John, Beni, David, Tim, Elton (JLab); Zisis, Andrei (UofR); Ryan, Matt (IU); Christina, George (Athens); Will (USM).

  1. Announcements
  2. Review of Action Items
  3. Calibration
    1. Questions about on how to proceed with project
      • Fcal: Matt proposed that a drawing of the FCAL with the plexiglass be put together and sent to Athens (and others) for comments and suggestions for connections to LED sources. Tim can suggest thickness of plexiglass necessary to maintain rigidity.
      • Bcal: Likely path will be using LED sources with connections to fibers which actually get attached to the light guide. Zisis will summarize measurements at UofR.
    2. MOU
      • Christina has sent around an update to their MOU, which includes Stratos Anassontzis, assistant prof, who has agreed to joint the project! He was responsible for the Barrel RICH calibration system of DELPHI with fibers!
  4. FCAL
    1. Construction Status: mechanical, bases
  5. BCAL
    1. Construction Status: builds, fibre QA
  6. Simulations
    1. Readout segmentation (summing, towers vs quadrants/blocks)
    2. Reconstruction: Study of Segmentation with BCal Reconstruction Code
  7. Other Updates

Splitoffs discussion:

  • slides (from May 2010 collab. meeting)