Difference between revisions of "Feb 18, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 31: Line 31:
 
#* Light sources in Bcal
 
#* Light sources in Bcal
 
# FCAL
 
# FCAL
#* Radiation Damage Studies
+
#* Radiation Damage Studies. See [http://www.jlab.org/~pentchev/calo/raddam.pdf Shashlyk Calorimeter Radiation Study]
 
#* Fabrication contract
 
#* Fabrication contract
 
#* CR for rad hard glass
 
#* CR for rad hard glass

Revision as of 11:13, 18 February 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Calibration/Monitoring
    • Geometry for inputing monitoring sources into Bcal
  2. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
    • Investigate mechanical issues associated with supporting lead glass on top of shashlik modules (Serguei)
  3. Bcal
    • Specify the normalization and dynamic range for the number of photons/GeV in showers
    • Decide on specific grouping for SiPM sums
    • Possibility of using air gap for SiPM coupling
    • Finalize shapes of "Winston guides"

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
    • Light sources in Bcal
  4. FCAL
  5. BCAL
    • Construction Status
    • Fibre tests
  6. BCAL Readout
    • Simulations
    • SiPMs update
    • Winston guides
    • Geometry for guides, sensors, cooling and cables
    • Update on USM MOU
  7. Other business

Minutes

Attendees: