Difference between revisions of "Feb 18, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 41: Line 41:
 
#* Simulations
 
#* Simulations
 
#* SiPMs update
 
#* SiPMs update
#* Winston guides
+
#* Light guides. See [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1432 GlueX-doc-1432] Figures 1,2,13,14.
 
#* Geometry for guides, sensors, cooling and cables
 
#* Geometry for guides, sensors, cooling and cables
 
#* Update on USM MOU
 
#* Update on USM MOU

Revision as of 11:35, 18 February 2010

Teleconference Time: 11:00 a.m. EST

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Calibration/Monitoring
    • Geometry for inputing monitoring sources into Bcal
  2. Fcal
    • Specify the number of Rad Hard blocks to writeup a change request to the project.
    • Investigate mechanical issues associated with supporting lead glass on top of shashlik modules (Serguei)
  3. Bcal
    • Specify the normalization and dynamic range for the number of photons/GeV in showers
    • Decide on specific grouping for SiPM sums
    • Possibility of using air gap for SiPM coupling
    • Finalize shapes of "Winston guides"

Documents to Review

Tentative Agenda

  1. Announcements
  2. Review of Action Items
  3. Calibration/Monitoring
    • Light sources in Bcal
  4. FCAL
  5. BCAL
    • Construction Status
    • Fibre tests
  6. BCAL Readout
    • Simulations
    • SiPMs update
    • Light guides. See GlueX-doc-1432 Figures 1,2,13,14.
    • Geometry for guides, sensors, cooling and cables
    • Update on USM MOU
  7. Other business

Minutes

Attendees: