Difference between revisions of "Feb 19, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Items for followup from Feb 12 meeting)
(Items for followup from Feb 12 meeting)
Line 12: Line 12:
 
#* Study impact of inactive material at the end of Bcal on acceptance.
 
#* Study impact of inactive material at the end of Bcal on acceptance.
 
#* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
 
#* Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
 +
# Elton, Matt and Zisis to send information regarding tools which have been used for studying light collection.
 +
# Review options for import/export to Chile (loans, donations, transfers, etc.)
  
 
= Documents to Review=
 
= Documents to Review=

Revision as of 19:01, 12 February 2009

Teleconference Time: 11:00 EST/10:00 CST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Feb 12 meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of Bcal on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Elton, Matt and Zisis to send information regarding tools which have been used for studying light collection.
  3. Review options for import/export to Chile (loans, donations, transfers, etc.)

Documents to Review

Tentative Agenda

  1. Announcements
  2. FCAL Update
  3. BCAL Update
    1. Bcal construction schedule
  4. BCAL Readout
  5. Simulations (Blake et al)
  6. Any other business