Difference between revisions of "Feb 19, 2009 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Tentative Agenda)
Line 24: Line 24:
 
# Announcements
 
# Announcements
 
# FCAL Update
 
# FCAL Update
# Simulations (Blake et al)
+
# Simulations (Blake et al)  
 +
## [[February 17, 2009 Physics]] with updates
 
# BCAL Update
 
# BCAL Update
 
## Bcal construction schedule
 
## Bcal construction schedule

Revision as of 18:00, 18 February 2009

Teleconference Time: 11:00 EST/10:00 CST

  • Phone:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 39527048# (remember the "#")

Items for followup from Feb 12 meeting

  1. Resolution studies (Blake)
    • Develop criteria for evaluating resolution studies
    • Study impact of inactive material at the end of Bcal on acceptance.
    • Check what configuration (thresholds, step sizes, stack? parameters for secondaries, etc) is being used for the Hall D simulations (Regina)
  2. Elton, Matt and Zisis to send information regarding tools which have been used for studying light collection.
  3. Review options for import/export to Chile (loans, donations, transfers, etc.)
  4. Matt: Add hooks to code so that DR and PDE can be provided as input parameters.

Documents to Review

Tentative Agenda

  1. Announcements
  2. FCAL Update
  3. Simulations (Blake et al)
    1. February 17, 2009 Physics with updates
  4. BCAL Update
    1. Bcal construction schedule
  5. BCAL Readout
    1. First look at first article fibers (Beni)
    2. Update on SiPM tests
  6. Review of Action Items

Minutes