Feb 2, 2011 SiPM Electrical and Cooling
From GlueXWiki
Revision as of 18:35, 2 February 2012 by Elton (Talk | contribs) (→Action Items from previous meetings)
Action Items from previous meetings
- Populate interface cards to the ADC (Chris)
-
Complete 3 remaining boards for SiPM testing (Chris)One board completed with capacitative coupling. Get feedback from test setup. - Determine if swapped bias pins was accidental or in design (Chris)
- Modify design so that the samtek/ADC transition board the locking mechanism works (Chris)
- Provide cost information to Chris regarding the thermistor (Jack)
-
Check to see if files sent from Athens can be read (Jim/Chris)Yes.
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: Chris, Jim, Ivan, Carl, Yi, Elton, Jack, Scot, Eugene
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)