# Run Updates
 
# Run Updates
 
## FCAL
 
## FCAL
 +
##* (Jon) A few bases have been replaced; overall the rate has slowed.  The PDU needs to be replaced. We need to make sure that gets done next week during the down time.
 +
##* Elton shipped back bases to IU and they have been received.
 
## BCAL
 
## BCAL
##*
 
 
##* [https://logbooks.jlab.org/entry/3785965 BCAL Voltage Trip] (Elton)
 
##* [https://logbooks.jlab.org/entry/3785965 BCAL Voltage Trip] (Elton)
 
##* [https://logbooks.jlab.org/entry/3786599 Temporary Fix]  
 
##* [https://logbooks.jlab.org/entry/3786599 Temporary Fix]  
 +
##* We need to take extra precautions when working around the magnet when the field is on.
 +
##* Karthik should check calibrations before and after the incident to verify that there are no changes.
 
# Calibrations
 
# Calibrations
 
## [https://logbooks.jlab.org/entry/3784683 BCAL Timing] (Mark)
 
## [https://logbooks.jlab.org/entry/3784683 BCAL Timing] (Mark)
 +
##* Timing shift from previous periods is ~50 ps. New constants have been loaded into ccdb.
 
# Monitoring
 
# Monitoring
 
## [https://logbooks.jlab.org/entry/3788087 Module 26 LED plots] (Varun)
 
## [https://logbooks.jlab.org/entry/3788087 Module 26 LED plots] (Varun)

Revision as of 15:04, 20 February 2020

Meeting Time: 11:00 a.m.

  1. To join via a Web Browser, go to the page [1] https://bluejeans.com/907185247.
  2. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 907185247.
  3. To join via phone, use one of the following numbers and the Conference ID: 907185247.
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
  5. More information on connecting to bluejeans is available.

Participant Direct Lines

  • JLab Phone in CC L207 is 757-269-7084 (usual room)
  • JLab Phone: in CC F326 is 757-269-6460
  • Phone in the Regina Video-conference Suite is 306-585-4204
  • Athens Phone: in Christina's office is 011-30-210-727-6947

References

  1. FCAL HDFCAL log book
  2. BCAL HDBCAL log book

Goals for Calorimetry Group

  1. Determine preliminary photon reconstruction efficiencies as a function of E, phi and theta in data and simulation with a point-to-point precision of at least 5%.
  2. Measure systematics of pi0/eta mass calibration as a function of detector position to a precision of at east 5 MeV.
  3. Demonstrate agreement of photon reconstruction efficiency and resolution between data and simulation as a function of E, phi and theta to within 5%.

Action Items

  1. Check that the 4ns shifts in the BCAL FADCs is absent with the new firmware (Mark) No timing shifts have been seen
  2. Complete Calorimeter work packages

Long term items

Tentative Agenda

  1. Announcements
    • Announcement at Production and Analysis meeting. Complete calibrations by April 1? See 2020 Data Production
  2. Action Items
  3. Run Updates
    1. FCAL
    2. BCAL
  4. Calibrations
    1. BCAL Timing (Mark)
  5. Monitoring
    1. Module 26 LED plots (Varun)
  6. Reconstruction
    1. Discussion of neutron implementation in halld_recon? For reference, Simon's survey (not using halld_recon)
  7. Efficiencies
    1. BCAL simulation efficiency and FCAL+DIRC updates (Jon)
  8. Simulations
  9. NIM articles
  10. Any other business

Minutes

Attending: Elton, Mark, Zisis, Jon, Chandra (JLab); Karthik, Varun (UofR); Sean (FSU); Christina (Athens); Susan (Juelich); Drew (Duke).

  1. Announcements
    • Matt is on shift and Colin is RC this week.
    • Announcement at Production and Analysis meeting. Complete calibrations by April 1? See 2020 Data Production
  2. Action Items
    • (Mark) BCAL channel timing completed. See below. Differences from previous periods is ~50 ps. Position, Up/Down ratios will be done next week. Karthik should wait till these are complete before beginning the gain calibrations.
  3. Run Updates
    1. FCAL
      • (Jon) A few bases have been replaced; overall the rate has slowed. The PDU needs to be replaced. We need to make sure that gets done next week during the down time.
      • Elton shipped back bases to IU and they have been received.
    2. BCAL
      • BCAL Voltage Trip (Elton)
      • Temporary Fix
      • We need to take extra precautions when working around the magnet when the field is on.
      • Karthik should check calibrations before and after the incident to verify that there are no changes.
  4. Calibrations
    1. BCAL Timing (Mark)
      • Timing shift from previous periods is ~50 ps. New constants have been loaded into ccdb.
  5. Monitoring
    1. Module 26 LED plots (Varun)
  6. Reconstruction
    1. Discussion of neutron implementation in halld_recon? For reference, Simon's survey (not using halld_recon)
  7. Efficiencies
    1. BCAL simulation efficiency and FCAL+DIRC updates (Jon)
  8. Simulations