(Action Items from previous meetings)
(Action Items from previous meetings)
Line 4: Line 4:
 
# Make low voltage cables for the SiPM test (Chris)
 
# Make low voltage cables for the SiPM test (Chris)
 
# Acquire material to absorb water for the box (Carl)
 
# Acquire material to absorb water for the box (Carl)
 +
# Order dew point sensor (Jim)
  
 
== Tentative Agenda ==
 
== Tentative Agenda ==

Revision as of 12:56, 10 February 2012

Action Items from previous meetings

  1. Determine if swapped bias pins was accidental or in design (Chris)
  2. Make low voltage cables for the SiPM test (Chris)
  3. Acquire material to absorb water for the box (Carl)
  4. Order dew point sensor (Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
  5. Mechanical assembly (Scot)
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando/Chris)
  10. SiPM testing (Ivan)

Minutes

Attending: