Difference between revisions of "Feb 23, 2011 SiPM Electrical and Cooling"
From GlueXWiki
(→Action Items from previous meetings) |
(→Action Items from previous meetings) |
||
Line 4: | Line 4: | ||
# Make low voltage cables for the SiPM test (Chris) | # Make low voltage cables for the SiPM test (Chris) | ||
# Acquire material to absorb water for the box (Carl) | # Acquire material to absorb water for the box (Carl) | ||
+ | # Order dew point sensor (Jim) | ||
== Tentative Agenda == | == Tentative Agenda == |
Revision as of 12:56, 10 February 2012
Action Items from previous meetings
- Determine if swapped bias pins was accidental or in design (Chris)
- Make low voltage cables for the SiPM test (Chris)
- Acquire material to absorb water for the box (Carl)
- Order dew point sensor (Jim)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- Mechanical assembly (Scot)
- Mechanical (Jim)
- Mechanical drawings (Chuck)
- Temperature compensation (Jack)
- Preamp-summing (Fernando/Chris)
- SiPM testing (Ivan)
Minutes
Attending: